CaliforniaPower & gridConfirmed
California approves interim faster grid-connection rule for large loads
CPUC partially approved interim Electric Rule 30 for transmission-level applicants willing to fund required infrastructure upfront.
Entity
CPUC partially approved interim Electric Rule 30 for transmission-level applicants willing to fund required infrastructure upfront.